CIVIL CONSTRUCTION PLANNING SOFTWARE

Digital pull planning for civil infrastructure projects

 

Keep crews, delivery plans and critical handoffs coordinated with Nialli™ Visual Planner. Give office and field teams a single project plan, even when they’re far away from the site trailer.

parallax image

Civil infrastructure work includes some of the most complex projects in the construction industry, where one missed handoff can stall an entire delivery plan.

Work spread across large areas icon

Work spread across large areas

  • Jobs so far apart that a quick huddle in the trailer turns into a drive across the site
  • Crews, subcontractors and specialized equipment are tied together through the same task dependencies
  • Sequential work where a missed commitment in one area of the site prevents work from starting in the next area.
Live operations and outdoor weather conditions icon

Live operations and outdoor conditions

  • Rail lines, level crossings, treatment plants and power infrastructure that have to keep running during construction
  • Limited access windows that can be lost altogether when work isn't ready on time
  • Rain, flooding and lightning that force teams to replan the current phase of work
Separate decisions from owners and contractors icon

Separate decisions from owners and contractors

  • Joint ventures where several firms share decisions on the same project
  • Owners who stay heavily involved and hold knowledge the general contractor doesn’t
  • Owner project managers and operating groups who need to track progress day to day from remote sites

Meet Nialli™ Visual Planner

Simple, hands-on collaborative civil infrastructure planning

Tracking task handoff and dependencies in Nialli Visual Planner

See every handoff before it holds up the next work phase

Map out work by trade and work area, connect task dependencies and clear constraints before crews and equipment sit idle. When a predecessor task is marked as incomplete, its connection turns red, flagging downstream work. Digital pull planning puts the people closest to the work in charge of project execution, using the proven Last Planner System® framework.

Plan backward from milestones

Import key activities and milestones from your master schedule. Then turn them into detailed schedules through a collaborative phase plan with direct input from the crews and subcontractors doing the work.

Manage constraints proactively

Log constraints like permits, inspections, access and material deliveries at the task or project level. Constrained tasks carry a visual indicator, so every crew member knows early what isn’t ready to proceed.

Replan when the weather turns

Make adjustments when needed to outdoor work exposed to the elements. As conditions change, you can move activities, flag and add weather events directly and replan through real-time collaboration without putting the overall schedule at risk.

Keep the whole project team working from one plan

Shift from top-down scheduling to reliable, bottom-up commitments. Instead of separate tools and whiteboard photos, crews, subcontractors, owners and joint venture partners all work from the same live plan on a single platform, wherever they are on the project.

Collaborative planning using Nialli Visual Planner

Provide access from the field

Enable field workers, superintendents and trade leads to check upcoming work, upload and view site photos, manage tasks and log constraints right from the jobsite on computers, tablets and smartphones with an internet connection.

Engage all trades

Involve everyone who needs access — there’s no limit on the number of users. An easy, hands-on interface keeps crews, specialty contractors and subcontractors engaged and contributing to daily status updates.

Give owners ground-level visibility

Share the live plan with owner project managers and operating groups so they can follow day-to-day progress and project information between site visits. Client communication runs off the same live plan.

Capturing constraints on ipad Nialli Visual Planner

Know where the project stands every day

Cut down administrative tasks and track daily progress across every work front. Measure project performance against the master schedule and pull your project data into the reports your team already uses. Because activities and milestones come in from the master schedule, project tracking happens against the plan everyone agreed to.

Track daily progress

View Percent Plan Complete and reasons for variance, which are automatically logged and calculated when crews mark work as complete or incomplete, so reporting becomes a routine task rather than extra admin.

Build reports in one click

Connect to Microsoft® Power BI and turn your key data into prebuilt analytics reports with a single click, including PPC by trade, planned versus actual crew size and variance from the master schedule.

Drive continuous improvement

See the full history of the project as it unfolded at the ground level. Use this information to improve future bids and schedules.

See collaborative planning on a civil infrastructure project

Aecon Group adopted the Last Planner System to improve collaboration, accountability and project outcomes on the Winnipeg North End Sewage Treatment Plant (NEWPCC) Upgrade Project. Key site members from the Red River Solutions Joint Venture share how they moved from traditional planning methods to a more transparent, team-driven approach with Nialli Visual Planner.

Explore more customer stories

Additional resources

MWH Treatment Nialli story

MWH Treatment's Lean journey

 

Continuous improvement is central to MWHT's success as a market leader in water and wastewater solutions across the UK. Learn more about their strategic use of Nialli Visual Planner.

Read their story

How to video series - why use Nialli Visual planner

Why visual planning?

Explore the benefits of visual planning in construction and why your project should consider digital pull planning. Check out Nialli's full how-to series next.

Watch how-to videos

The Last Planner System guide

How the Last Planner System works in Nialli Visual Planner

See how each stage of the Last Planner System, from master planning to weekly work planning, comes together in Nialli Visual Planner.

Read the blog

Improve civil infrastructure project delivery

Book a demo or try Nialli Visual Planner free for 30‑days.